SAFETY DRIVES zonal 15 DAYS 03.04.2026 TO17.04.2026 Fire prevention in Rly Installation (all department) DRIVE LETTER GOOGLE LINK div 7 DAYS 16.03.2026 TO22.03.2026 Counselling of TRD Staff for power block and Work site Safety DRIVE LETTER GOOGLE LINK ZONAL 10 DAYS 11.03.2026 TO20.03.2026 knowledge of station master's about fire alarm detection system DRIVE LETTER GOOGLE LINK ZONAL-4 15 DAYS 09.03.2026 TO23.03.2026 Availability of latest Plan Diagrams and matching of ESP, SIP, SWR, SWRD and VDUs DRIVE LETTER GOOGLE LINK div 7 DAYS 25.02.2026 TO03.03.2026 Availability of legible shock treatment chart & Proper OHE structure bond connection. DRIVE LETTER GOOGLE LINK rb-24 15 DAYS 21.02.2026 TO07.03.2026 “Fire Safety in Passenger Carrying Trains” DRIVE LETTER GOOGLE LINK zonal-3 7 DAYS 06.02.2026 TO12.02.2026 To check & ensure the proper working of Fire Alarm System installed in Relay/Panel Rooms & Goomties DRIVE LETTER GOOGLE LINK zonal 15 DAYS 04.02.2026 TO18.02.2026 Precautions during Loading and unloading DRIVE LETTER GOOGLE LINK RB-23 30+30 DAYS 19.01.2026 TO19.03.2026 Safety Inspection of Point & Crossing covering all Points & Crossings of Indian Railways DRIVE LETTER GOOGLE LINK RB-22 30+30 DAYS 16.01.2026 TO16.03.2026 Intra Railway Audit Instruction of lobbies & Running Room DRIVE LETTER GOOGLE LINK ZONAL 15 DAYS 10.01.2026 TO24.01.2026 Fire safety in trains ( at Linen Storage area ) DRIVE LETTER GOOGLE LINK RB-21 15 DAYS 01.01.2026 TO15.01.2026 Special Drive to counsel SM & ESM regarding Train Working DRIVE LETTER GOOGLE LINK RB-20 15 DAYS 13.12.2025 TO27.12.2025 signal visibility DRIVE LETTER GOOGLE LINK RB-spl 15 DAYS 08.11.2025 TO22.11.2025 PREVENTION OF SPAD DRIVE LETTER GOOGLE LINK RB 45 DAYS 27.10.2025 TO10.12.2025 Loading/Unloading and Safe Enroute Movement of EUR Rakes. DRIVE LETTER GOOGLE LINK ZONAL 15 DAYS 14.10.2025 TO28.10.2025 Ambush check during shunting, covering all shunting locations. DRIVE LETTER GOOGLE LINK RB-14 30 + 30 DAYS 22.09.2025 TO21.11.2025 RB SAFETY DRIVE FOR SAFETY INSPECTION OF POINTS & CROSSING (ENGG, S&T) DRIVE LETTER GOOGLE LINK DIV 15 DAYS 28.09.2025 TO12.10.2025 SPECIAL SAFETY DRIVE TO CHECK PROTECTION AT WORKSITE ENGG (ELECT/OP, ELECT/TRD, OPTG, S&T, MECH) DRIVE LETTER GOOGLE LINK ZONAL 15 DAYS 24.09.2025 TO08.10.2025 ZONAL SAFETY DRIVE ON PROPER LOADING AND MOVEMENT OF ODC OVER SECR (MECH, ELECT/OP, ELECT/TRD, OPTG, ENGG & COMMERCIAL) DRIVE LETTER GOOGLE LINK rb-15 30 DAYS 25.09.2025 TO24.10.2025 SPECIAL DRIVE ON SPAD COVERING ALL LPS, ALPS, TRACK MACHINE OPERATORS & TOWER WAGON OPERATORS AT ALL LOCATIONS OF IR (ELECT/OP, ELECT/TRD) DRIVE LETTER GOOGLE LINK DIV 15 DAYS 28.09.2025 TO12.10.2025 SPECIAL SAFETY DRIVE TO CHECK PROTECTION AT WORKSITE ENGG (ELECT/OP, ELECT/TRD, OPTG, S&T, MECH) DRIVE LETTER GOOGLE LINK