SAFETY DRIVES

div

7 DAYS

25.02.2026
TO
03.03.2026

Availability of legible shock treatment chart & Proper OHE structure bond connection.

rb-24

15 DAYS

21.02.2026
TO
07.03.2026

“Fire Safety in Passenger Carrying Trains”

zonal-3

7 DAYS

06.02.2026
TO
12.02.2026

To check & ensure the proper working of Fire Alarm System installed in Relay/Panel Rooms & Goomties

zonal

15 DAYS

04.02.2026
TO
18.02.2026

Precautions during Loading and unloading

RB-23

30+30 DAYS

19.01.2026
TO
19.03.2026

Safety Inspection of Point & Crossing covering all Points & Crossings of Indian Railways

RB-22

30+30 DAYS

16.01.2026
TO
16.03.2026

Intra Railway Audit Instruction of lobbies & Running Room

ZONAL

15 DAYS

10.01.2026
TO
24.01.2026

Fire safety in trains ( at Linen Storage area )

RB-21

15 DAYS

01.01.2026
TO
15.01.2026

Special Drive to counsel SM & ESM regarding Train Working

RB-20

15 DAYS

13.12.2025
TO
27.12.2025

signal visibility

RB-spl

15 DAYS

08.11.2025
TO
22.11.2025

PREVENTION OF SPAD

RB

45 DAYS

27.10.2025
TO
10.12.2025

Loading/Unloading and Safe Enroute Movement of EUR Rakes.

ZONAL

15 DAYS

14.10.2025
TO
28.10.2025

Ambush check during shunting, covering all shunting locations.

RB-14

30 + 30 DAYS

22.09.2025
TO
21.11.2025

RB SAFETY DRIVE FOR SAFETY INSPECTION OF POINTS & CROSSING (ENGG, S&T)

DIV

15 DAYS

28.09.2025
TO
12.10.2025

SPECIAL SAFETY DRIVE TO CHECK PROTECTION AT WORKSITE ENGG (ELECT/OP, ELECT/TRD, OPTG, S&T, MECH)

ZONAL

15 DAYS

24.09.2025
TO
08.10.2025

ZONAL SAFETY DRIVE ON PROPER LOADING AND MOVEMENT OF ODC OVER SECR (MECH, ELECT/OP, ELECT/TRD, OPTG, ENGG & COMMERCIAL)

rb-15

30 DAYS

25.09.2025
TO
24.10.2025

SPECIAL DRIVE ON SPAD COVERING ALL LPS, ALPS, TRACK MACHINE OPERATORS & TOWER WAGON OPERATORS AT ALL LOCATIONS OF IR (ELECT/OP, ELECT/TRD)

DIV

15 DAYS

28.09.2025
TO
12.10.2025

SPECIAL SAFETY DRIVE TO CHECK PROTECTION AT WORKSITE ENGG (ELECT/OP, ELECT/TRD, OPTG, S&T, MECH)

Scroll to Top