CHALAK PATRA

dec-2025

LOCO BRAKE, SA-9 INLET OUTLET, CONJUNCTION BRAKING, MR4 MASTER COCK, BC EQULIZING, BC-1 & BC-2, MU2B
dec-2025

nov-2025

CP CAPEBILITY TEST, BP, FP LEKAGE TEST IN LOCO & TRAIN (CONVENTIONAL , 3Phase & CCB2/EMCBS), BP LEAKAGE TEST IN WAG-12
nov-2025

OCT-2025

WAG-12 DERAILMENT CASE STUDY, WAG-9 & WAG-12 (MODIFIED & NON MODIFIED) & CONVENTIONAL MEMU REVERSER DISCRIPTION
OCT-2025

SEP-2025

WAG-9,WAP-7,WAP-5 लोको में CCB2 के EBV (Electronic Brake Valve) पर आए फॉल्ट कोड
SEP-2025

AUG-2025

3 phase LOCO TROUBLE RELATED LOCO BRAKE SYSTEM AND THEIR TROUBLE SHOOTING
AUG-2025

JUL-2025

JUN-2025

LT CIRCUIT CONVENTIONAL LOCO & BATTERY FAULT, 3 PHASE LOCO BATTERY & CHARGER RELATED FAULT
JUN-2025

MAY-2025

CASE STUDY-1 & 2, PARKING BRAKE
MAY-2025

APR-2025

3 PHASE LOCO TFP & SR COOLING, PRESSURE & TEMP TROUBLE, OCB, TFP OIL PUMP, CONVERTER COOLENT PUMP, CASE STUDY, FATAL ERROR
APR-2025

MAR-2025

CAB CHANGING ON CONVENTIONAL, 3 PHASE, WAG-12, MEMU, 3 PHASE MEMU, T-18 TRAIN
MAR-2025

FEB-2025

CASE STUDY AUX EARTH FAULT, BUR-2 BUR-1 AND BUR-2 BUR-3 ISOLATION
FEB-2025

JAN-2025

TLTE ON CONVENTIONAL LOCO, 3 PHASE LOCO NO OR LESS TRACTION
JAN-2025
Scroll to Top